20A Kijewo–Płonia Cycle Path – Green Bridge over the Płonia loop from Szczecin Zdroje
20A Kijewo–Płonia Cycle Path – Green Bridge over the Płonia loop from Szczecin Zdroje
5.0
(1)
35
riders
01:53
46.1km
150m
Road cycling
Moderate road ride. Great for any fitness level. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: August 26, 2026
Tips
Cycling is not permitted along parts of this route
After 0 m for 277 m
After 45.9 km for 230 m
Waypoints
Start point
Train Station
2.84 km
Highlight (Segment) • Cycleway
Showing Translation
Tip by
25.6 km
Highlight • Rest Area
Translated by Google •
Tip by
28.8 km
Highlight • Bridge
Translated by Google •
Tip by
39.5 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
42.0 km
Highlight • Bridge
Translated by Google •
Tip by
46.1 km
End point
Train Station
Way Types & Surfaces
Way Types
32.4 km
12.2 km
666 m
451 m
352 m
< 100 m
Surfaces
44.2 km
1.38 km
347 m
181 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (60 m)
Lowest point (0 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Friday 23 October
13°C
8°C
41 %
Additional weather tips
There’s a fairly high chance of rain. Consider packing a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.