Roadbike loop from Redlands–Esri
Roadbike loop from Redlands–Esri
4.5
(6360)
13,141
riders
02:06
44.6km
510m
Road cycling
Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: August 10, 2026
Tips
Your route passes through a protected area
Please check local regulations for:
San Timoteo Canyon
Waypoints
Start point
Train Station
Get Directions
44.6 km
End point
Train Station
Way Types & Surfaces
Way Types
29.1 km
6.36 km
5.12 km
2.92 km
1.00 km
< 100 m
Surfaces
40.7 km
3.88 km
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Tuesday 25 August
42°C
23°C
0 %
Additional weather tips
Max wind speed: 19.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free