Findhorn Bridge – Moy Viaduct loop from Tomatin Distillery
Findhorn Bridge – Moy Viaduct loop from Tomatin Distillery
26
riders
03:05
48.1km
510m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: April 2, 2026
Waypoints
Start point
Bus stop
Get Directions
2.20 km
Highlight • Monument
Tip by
7.71 km
Highlight • Viewpoint
19.9 km
Highlight • Forest
Tip by
35.7 km
Highlight • Other
38.8 km
Highlight • Historical Site
Tip by
40.3 km
Highlight • Structure
Tip by
45.6 km
Highlight • Structure
Tip by
46.8 km
Highlight • Historical Site
Translated by Google •
Tip by
48.1 km
End point
Bus stop
Way Types & Surfaces
Way Types
44.0 km
2.42 km
1.03 km
680 m
Surfaces
28.2 km
18.4 km
814 m
680 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (470 m)
Lowest point (160 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 7 May
13°C
3°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.