Mary Carter Greenway Trail – View from Chatfield Dam loop from County Line
Mary Carter Greenway Trail – View from Chatfield Dam loop from County Line
2.8
(23)
32
riders
02:45
51.8km
370m
Road cycling
Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: October 16, 2026
Tips
Cycling is not permitted along parts of this route
After 32.0 km for 155 m
After 36.4 km for 119 m
Waypoints
Start point
Train Station
14.8 km
Highlight (Segment) • Cycleway
Tip by
16.8 km
Highlight • River
Tip by
17.8 km
Highlight • Lake
Tip by
18.0 km
Highlight (Segment) • Trail
Tip by
19.7 km
Highlight (Segment) • Trail
Tip by
22.7 km
Highlight • River
Tip by
27.6 km
Highlight • Lake
Showing Translation
Tip by
32.6 km
Highlight • Viewpoint
Tip by
51.8 km
End point
Train Station
Way Types & Surfaces
Way Types
44.6 km
6.12 km
618 m
353 m
< 100 m
< 100 m
< 100 m
Surfaces
40.0 km
11.6 km
190 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Friday 23 October
24°C
11°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.