Miccosukee Greenway – Canopy Bridge loop from 2020 Fleiscmann Road
Miccosukee Greenway – Canopy Bridge loop from 2020 Fleiscmann Road
3.3
(2)
42
runners
01:33
12.7km
120m
Running
Moderate run. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: March 26, 2026
Waypoints
Start point
Bus stop
Get Directions
291 m
Highlight (Segment) • Trail
Tip by
6.33 km
Highlight • Bridge
Tip by
12.7 km
End point
Bus stop
Way Types & Surfaces
Way Types
12.1 km
196 m
189 m
139 m
Surfaces
10.6 km
1.52 km
335 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Friday 8 May
26°C
18°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.