Small Bridge over the Touch – Bank of the Touch loop from Tournefeuille
Small Bridge over the Touch – Bank of the Touch loop from Tournefeuille
5.0
(6)
34
riders
01:37
26.0km
90m
Gravel riding
Easy gravel ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: March 10, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 13.2 km for 5 m
After 13.3 km for 3 m
After 13.9 km for 1 m
After 19.4 km for 11 m
After 21.5 km for 11 m
After 21.6 km for 12 m
Waypoints
Start point
Bus stop
Get Directions
4.96 km
Highlight • Bridge
Translated by Google •
Tip by
9.02 km
Highlight • Lake
Translated by Google •
Tip by
10.1 km
Highlight • Other
12.2 km
Highlight • River
Translated by Google •
Tip by
13.2 km
Highlight • Other
Translated by Google •
Tip by
13.7 km
Highlight • Other
Translated by Google •
Tip by
16.6 km
Highlight • Monument
Translated by Google •
Tip by
16.6 km
Highlight • Monument
26.0 km
End point
Bus stop
Way Types & Surfaces
Way Types
9.56 km
8.22 km
5.60 km
1.43 km
988 m
174 m
Surfaces
12.9 km
5.19 km
5.16 km
2.16 km
441 m
134 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Saturday 23 May
33°C
14°C
0 %
Additional weather tips
Max wind speed: 19.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.