Penmaenpool Toll Bridge – Penmaenpool Toll Bridge loop from Dolgellau
Penmaenpool Toll Bridge – Penmaenpool Toll Bridge loop from Dolgellau
15
riders
02:10
31.0km
520m
Gravel riding
Hard gravel ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is right next to a parking lot.
Last updated: March 27, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 3.52 km for 119 m
Open: • Monday-Friday: 7:30 AM-6:30 PM • Saturday: 8:30 AM-6:30 PM • Sunday: 10:00 AM-6:30 PM (otherwise closed)
Waypoints
Start point
Parking
Get Directions
3.35 km
Highlight • Viewpoint
Tip by
3.35 km
Highlight • Bridge
Tip by
3.43 km
Highlight • Bridge
Tip by
11.5 km
Highlight (Segment) • Viewpoint
Tip by
19.8 km
Highlight • Trail
Tip by
20.4 km
Highlight • Parking
Tip by
20.5 km
Highlight (Segment) • Trail
Tip by
21.7 km
Highlight (Segment) • Trail
Tip by
27.6 km
Coed Dol-y-clochydd
Forest
31.0 km
End point
Parking
Way Types & Surfaces
Way Types
13.7 km
12.9 km
1.62 km
1.24 km
830 m
710 m
Surfaces
13.3 km
10.2 km
5.57 km
1.99 km
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (360 m)
Lowest point (0 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Wednesday 24 June
32°C
17°C
0 %
Additional weather tips
Max wind speed: 18.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free