Findhorn Bridge – Tomatin Viaduct loop from Dumnaglass Road End
Findhorn Bridge – Tomatin Viaduct loop from Dumnaglass Road End
66
riders
03:13
66.0km
570m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: August 27, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 31.0 km for 70 m
Customers only
Waypoints
Start point
Bus stop
Get Directions
12.2 km
Highlight • Forest
Tip by
24.4 km
Highlight • Viewpoint
29.9 km
Highlight • Monument
Tip by
31.0 km
Highlight • River
31.4 km
Highlight • Historical Site
Translated by Google •
Tip by
35.1 km
Highlight • Trail
66.0 km
End point
Bus stop
Way Types & Surfaces
Way Types
61.4 km
2.20 km
1.08 km
768 m
513 m
< 100 m
Surfaces
51.5 km
12.8 km
912 m
855 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (470 m)
Lowest point (160 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 3 September
15°C
11°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free