ŻEBROK Pond – Footbridge over the tracks in BIERUŃ loop from Oświęcim
ŻEBROK Pond – Footbridge over the tracks in BIERUŃ loop from Oświęcim
8
riders
02:49
50.9km
140m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: September 30, 2026
Tips
Cycling is not permitted along parts of this route
After 0 m for 202 m
After 46.2 km for 59 m
After 50.8 km for 209 m
Waypoints
Start point
Train Station
2.58 km
Highlight • Historical Site
Translated by Google •
Tip by
7.47 km
Highlight • Bridge
Translated by Google •
Tip by
20.8 km
Highlight • Lake
Showing Translation
Tip by
22.1 km
Highlight • Trail
Translated by Google •
Tip by
32.6 km
Highlight • River
Translated by Google •
Tip by
36.2 km
Highlight • Bridge
Translated by Google •
Tip by
36.6 km
Highlight • Rest Area
Translated by Google •
Tip by
36.6 km
Highlight • Religious Site
Translated by Google •
Tip by
50.9 km
End point
Train Station
Way Types & Surfaces
Way Types
18.5 km
14.0 km
11.7 km
6.19 km
305 m
239 m
< 100 m
Surfaces
20.3 km
19.4 km
6.52 km
3.71 km
980 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Tuesday 20 October
20°C
6°C
0 %
Additional weather tips
Max wind speed: 15.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.