Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Canada
British Columbia
Burnaby

Pitt River Bridge – Central Valley Greenway loop from Gilmore

Routes
Canada
British Columbia
Burnaby

Pitt River Bridge – Central Valley Greenway loop from Gilmore

Moderate

41

riders

Pitt River Bridge – Central Valley Greenway loop from Gilmore

03:24

64.3km

440m

Gravel riding

Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: June 20, 2026

Tips

Includes a very steep uphill segment

You may need to push your bike.

After 8.10 km for 230 m

Waypoints

A

Start point

Train Station

Get Directions

7.23 km

Barnet Marine Park

Forest

13.2 km

Viewpoint

Viewpoint

3

21.8 km

Frog Sculpture at Lafarge Lake–Douglas Station

Highlight • Monument

4

23.7 km

Trans Canada Trail – Coquitlam

Highlight (Segment) • Trail

This section of the Trans Canada Trail follows the wooded banks of the Coquitlam River through Coquitlam. The mostly gravel path runs through forested river habitat, offering a quiet stretch …

Tip by

5

26.3 km

Hyde Creek Salmon Hatchery

Highlight • Structure

Operated by volunteers. Usually open to the public on Saturday mornings.

Tip by

27.1 km

Hyde Creek Nature Reserve

Nature Reserve

7

35.1 km

Pitt River Bridge

Highlight • Bridge

The Pitt River Bridge is a cable-stayed bridge that spans the Pitt River between Port Coquitlam and Pitt Meadows in British Columbia, Canada.

Tip by

8

37.7 km

42.7 km

Coquitlam River Wildlife Management Area

Nature Reserve

10

52.1 km

North Rail Disaster Memorial

Highlight • Monument

BC Labour Heritage
City of Burnaby
Great Northern Railway Disaster, 1909
In the early hours of November 29, 1909, a Great Northern train transporting 43 railway labourers to carry out …

Tip by

11

52.9 km

Central Valley Greenway

Highlight • Cycleway

12

60.2 km

Pedestrian and Bicycle Bridge

Highlight • Bridge

B

64.3 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

26.9 km

26.7 km

5.78 km

2.90 km

1.77 km

148 m

109 m

Surfaces

30.3 km

22.8 km

5.53 km

4.72 km

965 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (110 m)

Lowest point (0 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Friday 26 June

18°C

13°C

93 %

Additional weather tips

Max wind speed: 18.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Hard

5.0

296

Seymour Demonstration Forest – Seymour Trailway loop from VCC–Clark

03:36h

58.7km

760m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy