Bullay Railway Bridge – Pünderich Hang Viaduct loop from Bullay (DB)
Bullay Railway Bridge – Pünderich Hang Viaduct loop from Bullay (DB)
4.7
(20)
119
riders
03:11
48.8km
660m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 17, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 36 m for 15 m
After 48.8 km for 15 m
Waypoints
Start point
Train Station
Get Directions
849 m
Highlight • Bridge
Translated by Google •
Tip by
1.05 km
Highlight • Bridge
Translated by Google •
Tip by
1.10 km
Highlight • Bridge
Translated by Google •
Tip by
3.43 km
Highlight • Viewpoint
Translated by Google •
Tip by
5.48 km
Viewpoint
Viewpoint
6.48 km
Highlight • Bridge
Translated by Google •
Tip by
39.4 km
Highlight (Segment) • Viewpoint
Translated by Google •
Tip by
40.6 km
Highlight • Viewpoint
Translated by Google •
Tip by
43.2 km
Highlight • Bridge
Translated by Google •
Tip by
48.8 km
End point
Train Station
Way Types & Surfaces
Way Types
25.7 km
12.5 km
7.59 km
2.42 km
333 m
253 m
< 100 m
Surfaces
45.0 km
3.28 km
322 m
181 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (430 m)
Lowest point (100 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Tuesday 7 July
26°C
17°C
14 %
Additional weather tips
Max wind speed: 14.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free