Queen's Arms – Bridge Over Dried Riverbed loop from Litton
Queen's Arms – Bridge Over Dried Riverbed loop from Litton
5.0
(1)
20
hikers
03:32
12.6km
230m
Hiking
Moderate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.
Last updated: April 16, 2026
Tips
Your route passes through a protected area
Please check local regulations for:
Waypoints
Start point
Get Directions
125 m
Highlight • Restaurant
Tip by
8.29 km
Highlight • Trail
Tip by
9.58 km
Highlight • Viewpoint
9.63 km
Highlight (Segment) • Trail
Tip by
11.6 km
Highlight • Cafe
Tip by
11.7 km
Highlight • River
Tip by
12.6 km
End point
Way Types & Surfaces
Way Types
11.3 km
737 m
452 m
112 m
Surfaces
5.57 km
4.71 km
765 m
762 m
515 m
261 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (420 m)
Lowest point (250 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Wednesday 6 May
12°C
2°C
33 %
Additional weather tips
Max wind speed: 19.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.