Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Login or Signup

Routes
Road cycling routes
Canada
Manitoba
Winnipeg

Manitoba Railway Museum – Esplanade Riel Footbridge loop from Winnipeg

Routes
Road cycling routes
Canada
Manitoba
Winnipeg

Manitoba Railway Museum – Esplanade Riel Footbridge loop from Winnipeg

Moderate

57

riders

Manitoba Railway Museum – Esplanade Riel Footbridge loop from Winnipeg

03:18

68.7km

80m

Road cycling

Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.

Last updated: April 2, 2026

Tips

The surface along some of this route may not be suitable

Some segments of your route comprise a surface that may not be suitable for your chosen sport.

After 1.59 km for 241 m

After 2.11 km for 103 m

After 60.5 km for 210 m

Waypoints

A

Start point

Train Station

Get Directions

1

26 m

Winnipeg Railway Museum

Highlight • Monument

2

730 m

Canadian Museum for Human Rights

Highlight • Monument

The museum is an absolute highlight, both in terms of content and architecture. You need a good 2-3 hours to get an overview. The thematic arrangement is perfectly done, but …

Translated by Google •

Tip by

3

1.22 km

Esplanade Riel Footbridge

Highlight • Bridge

The impressive pedestrian bridge was built in 2003, spans the Red River and connects the two districts of St. Boniface and The Forks in Winnipeg.

Translated by Google •

Tip by

4

2.03 km

The Forks National Historic Site

Highlight • Historical Site

The Forks is the heart of Winnipeg. Frequented by Indigenous peoples thousands of years ago, it is now home to a pleasant park on the banks of the Red and …

Translated by Google •

Tip by

60.0 km

Dove Bay Park

Forest

6

60.7 km

Red River Viewpoint

Highlight • Viewpoint

This is a beautiul spot with a lovely bench situated right along the river, where you can take in the view of its forested banks and the gently flowing water …

Tip by

7

61.1 km

Crescent Drive Park

Highlight • Natural

Crescent Drive Park is a beautiful 25-hectare riverside green space, with mature trees, quiet trails, and open picnic areas. There is a year-round pavilion with a fireplace and patio, a …

Tip by

B

68.7 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

22.7 km

21.6 km

17.1 km

6.11 km

649 m

527 m

116 m

Surfaces

48.0 km

19.7 km

403 m

291 m

270 m

196 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Wednesday 6 May

6°C

-1°C

15 %

Additional weather tips

Max wind speed: 10.0 km/h

to get more detailed weather forecasts along your route

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Moderate

57

Manitoba Railway Museum – Esplanade Riel Footbridge loop from Winnipeg

03:19h

68.7km

80m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy